GeoMine Intel · flagship evidence pack

Guyana environmental exposure screening pack

What measured waterway and watershed context surrounds this title?

PUBLIC EXAMPLEGUYANA · GUYLive-curated evidence
Download PDFAll flagship packsThe PDF contains the same findings, evidence, citations and limitations shown here.
Title referenceGS23: H-94/MP/002/13
Mapped area4.80 km²
Intersecting reaches1
Local basin6080094430
Screening position

Measured screening context; site and authority verification required

The selected title intersects modelled waterways and sits within a resolved watershed hierarchy. This identifies environmental follow-up priorities, not harm, compliance, or causation.

Evidence typeTitle geometry · hydrology measurements · source caveatsLatest source update · 24 Oct 2026, 19:56 UTC
Three material findings
  1. The stored title polygon intersects 1 modelled HydroRIVERS reaches.
  2. HydroBASINS levels 8, 7, and 6 provide local, intermediate, and regional drainage context; the local basin is 6080094430.
  3. Protected-area and forestry geometry is excluded unless its source and layer are explicitly approved for client use.
02 · Mapped evidence

Title, waterways and watershed context

Measured context from approved title and HydroSHEDS layers; unavailable overlays remain explicit.

Mapped Guyana title with approved waterway and watershed screening context
Approved public title and HydroSHEDS screening layers only. This is not a cadastral survey or legal determination.
03 · Claim and citation ledger

Evidence supporting this screen

Material statements are tied to a source or identified as an application-generated calculation.

Title referenceGS23: H-94/MP/002/13
Mapped area4.80 km²
Intersecting reaches1
Local basin6080094430
Spatial useScreening context
04 · Decision controls

Principal limitations

  • HydroRIVERS and HydroBASINS are modelled regional datasets, not field observations.
  • Intersection does not establish pollution, impact, non-compliance, or legal restriction.
05 · Next checks

Recommended follow-up

  1. Confirm current title status and recorded parties with the responsible mining authority.
  2. Check the generated date, source freshness, citations, and stated missing-data gaps before relying on a finding.
  3. Use current site-specific surveys, regulatory records, and professional advice for material decisions.
Automated screening productAutomated screening based on available cited sources; not analyst verification, legal advice, ownership confirmation, a cadastral determination, an environmental compliance finding, or investment advice.Full report-use limitations
Apply this workflow to your question

Request this evidence pack

Bring a holder, licence, plot, area or monitoring question. Available evidence and unresolved gaps remain explicit.